Monday, September 29, 2008
I finally got to do something besides painting!
We started off the weekend a little early. Matt took a half day to work on the kitchen. I worked on putting the first coat of polyurethane on the floors on Friday. Matt went to Chicago for the weekend for rugby. I put down the second coat on the floors on Saturday morning, and painted the basement with waterproofing paint with my Dad in the afternoon. Sunday, I learned how to put down the floor in the upstairs bathroom and we moved our stuff out of storage and into our basement and garage. Here's some more pics!
My Dad moving stuff around in the garage that my Grandpa spent a lot of time organizing and cleaning up.
The purple room is still purple, but the floor is done.
Our Bedroom painted, before the floor was finished
Tuesday, September 23, 2008
Leftovers from the weekend
Here are some pictures that were on Matt's camera before the battery died from this weekend. They are a little bit out of order.
Monday, September 22, 2008
Lots of help this weekend!
This past week we didn't get much done after Monday when Matt finished sanding all the floors in one day. We've also been having some camera trouble, since all the cords that go with my camera are in storage.
Scott came home from school to help demolish the kitchen and Matt's parents came to help knock out the wall between the kitchen and dining room. Here's a couple pictures of what our kitchen looks like now (not much like a kitchen at all).


First coat of paint.
Basement walls painted.
Picked up a washer and dryer this weekend.
It's starting to come together. We get the cabinets for the kitchen late this week or early next week. Until then, there is still lots of painting to do and lots of prep work in the kitchen, like wiring and stuff. We appreciate all the help that we have been getting!
Monday, September 15, 2008
Weekend Progress: working around rugby games
This weekend we got more accomplished than I expected since we both played Rugby this weekend (Matt at home vs. Detroit and I played in Detroit). We still managed to get some more painting and bathroom work done.

We now have the drywall all up in the bathroom and we its ready to be sanded and painted. We are going to take a break from painting and the bathroom and work on refinishing the floors this week.
We now have the drywall all up in the bathroom and we its ready to be sanded and painted. We are going to take a break from painting and the bathroom and work on refinishing the floors this week.
Thursday, September 11, 2008
First week of progress
Almost a weeks worth of work on the house....
We are getting somewhere. There was lots of destruction in the first couple days.
The first thing that had to be done was to rip out all the paneling in the basement since it was moldy. The upstairs bathroom was completely demolished including the ~500lb bathtub.

Matt & my dad did a good job demolishing the bathroom. Matt is standing in the spot where the bathtub used to be.


Plumbing and electric need to be redone. Matt is almost done with that.

Look the tub is in!


The 2 upstairs bedrooms double as workspace.


I started painting. The brownish room is the dining room which used to be bright pink. The greenish blue room is the half bathroom downstairs which used to be light blue. Still have alot more painting to go, but all the downstairs rooms, besides the kitchen are ready to be painted.


Stairway to basement. Red Shag carpet removed from the walls and ceilings. There is still red and green plaid carpet on the stairs. Bare walls, without moldy paneling. Almost dry basement.


The kitchen is full of at least 4 toolboxes and lots of paint, nothing kitchen related.

Sunroom has lots of miscellaneous stuff, but most importantly a fridge!
Hopefully we can get some work done this weekend. We need to get the floors refinished before we move in.
We are getting somewhere. There was lots of destruction in the first couple days.
| From Kristin & Matt's Fixer-Upper |
Matt & my dad did a good job demolishing the bathroom. Matt is standing in the spot where the bathtub used to be.
Plumbing and electric need to be redone. Matt is almost done with that.
Look the tub is in!
The 2 upstairs bedrooms double as workspace.
I started painting. The brownish room is the dining room which used to be bright pink. The greenish blue room is the half bathroom downstairs which used to be light blue. Still have alot more painting to go, but all the downstairs rooms, besides the kitchen are ready to be painted.
Stairway to basement. Red Shag carpet removed from the walls and ceilings. There is still red and green plaid carpet on the stairs. Bare walls, without moldy paneling. Almost dry basement.
The kitchen is full of at least 4 toolboxes and lots of paint, nothing kitchen related.
Sunroom has lots of miscellaneous stuff, but most importantly a fridge!
Hopefully we can get some work done this weekend. We need to get the floors refinished before we move in.